Users of this system, can login to view this document.
Login
Enter the following information to request a copy of the document from the responsible person.
Optimasi Waktu Dan Biaya Dengan Integrasi Metode Building Information Modeling (BIM) 4D dan Time Cost Trade Off (Studi Kasus: Proyek Jembatan Pemali)
This email address is used for sending the document.