• Login
    Search 
    •   DSpace Home
    • Search
    •   DSpace Home
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-1 of 1

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    PRANCANGAN PABRIK HIDROGEN DARI GAS ALAM DENGAN KAPASITAS 100.000 TPA 

    Muzammil, Isak; Arianti, Tesa Mawar; Azzahra, Siti Fatimah (2022-01-31)
    Pabrik hidrogen dari gas alam dirancang dengan kapasitas 100.000 metrik ton/tahun dan beroperasi terus menerus selama 300 hari/tahun selama 24 jam/hari. Untuk mencapai target produksi, Dibutuhkan 44.205,98 kg/jam gas alam ...

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Discover

    AuthorArianti, Tesa Mawar (1)Azzahra, Siti Fatimah (1)Muzammil, Isak (1)Subject
    Capstone (Desain Pabrik Kimia) (1)
    Gas Alam (1)
    Hidrogen (1)... View MoreDate Issued2022 (1)Has File(s)true (1)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV