<?xml version="1.0" encoding="UTF-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/">
<title>STUDENT INTERNSHIP REPORT (ME)</title>
<link href="https://library.universitaspertamina.ac.id//xmlui/handle/123456789/68" rel="alternate"/>
<subtitle>Collections of Mechanical Engineering Student Internship Report</subtitle>
<id>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/68</id>
<updated>2026-04-15T10:53:26Z</updated>
<dc:date>2026-04-15T10:53:26Z</dc:date>
<entry>
<title>ANALISIS HASIL PENGELASAN PIPA DENGAN METODE NON DESTRUCTIVE TEST (NDT) MENGGUNAKAN SINAR GAMMA RAY DI PT. RAGA  UTAMA PERKASA, CILEGON</title>
<link href="https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15424" rel="alternate"/>
<author>
<name>Mahesa Putra, Muhammad Raga</name>
</author>
<author>
<name>Mahesa Putra, Muhammad Raga</name>
</author>
<id>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15424</id>
<updated>2026-02-08T18:26:05Z</updated>
<published>2026-02-04T00:00:00Z</published>
<summary type="text">ANALISIS HASIL PENGELASAN PIPA DENGAN METODE NON DESTRUCTIVE TEST (NDT) MENGGUNAKAN SINAR GAMMA RAY DI PT. RAGA  UTAMA PERKASA, CILEGON
Mahesa Putra, Muhammad Raga; Mahesa Putra, Muhammad Raga
</summary>
<dc:date>2026-02-04T00:00:00Z</dc:date>
</entry>
<entry>
<title>ANALISI KEGAGALAN PADA ROBOT SUB ASSEMBLY LINI PERAKITAN QUARTER TRIM DI AREA FACTORY 2 PT SUGITY CREATIVES MENGGUNAKAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA)</title>
<link href="https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15423" rel="alternate"/>
<author>
<name>Pratama, Aditya</name>
</author>
<id>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15423</id>
<updated>2026-02-08T18:21:12Z</updated>
<published>2026-01-04T00:00:00Z</published>
<summary type="text">ANALISI KEGAGALAN PADA ROBOT SUB ASSEMBLY LINI PERAKITAN QUARTER TRIM DI AREA FACTORY 2 PT SUGITY CREATIVES MENGGUNAKAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA)
Pratama, Aditya
</summary>
<dc:date>2026-01-04T00:00:00Z</dc:date>
</entry>
<entry>
<title>Studi Penerapan Quick Service Maintenance di Workshop Hyundai  Gowa : Standar Operasional, Implementasi di Lapangan dan  Analisis Perbandingan dengan Preventive Maintenance</title>
<link href="https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15348" rel="alternate"/>
<author>
<name>Adi Kusuma Putra, Hartanto</name>
</author>
<id>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15348</id>
<updated>2026-01-30T08:11:29Z</updated>
<published>2026-01-30T00:00:00Z</published>
<summary type="text">Studi Penerapan Quick Service Maintenance di Workshop Hyundai  Gowa : Standar Operasional, Implementasi di Lapangan dan  Analisis Perbandingan dengan Preventive Maintenance
Adi Kusuma Putra, Hartanto
</summary>
<dc:date>2026-01-30T00:00:00Z</dc:date>
</entry>
<entry>
<title>ANALISIS PENERAPAN PREVENTIVE DAN  CORRECTIVE MAINTENANCE PADA AUTOMATIC  ARM ROBOT IMPULSE DI AREA SUB ASSEMBLY  DOOR TRIM FACTORY 2 PT SUGITY CREATIVES</title>
<link href="https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15287" rel="alternate"/>
<author>
<name/>
</author>
<id>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15287</id>
<updated>2026-01-09T09:38:32Z</updated>
<published>2025-12-12T00:00:00Z</published>
<summary type="text">ANALISIS PENERAPAN PREVENTIVE DAN  CORRECTIVE MAINTENANCE PADA AUTOMATIC  ARM ROBOT IMPULSE DI AREA SUB ASSEMBLY  DOOR TRIM FACTORY 2 PT SUGITY CREATIVES
PT Sugity Creatives telah menerapkan Automatic Arm Robot Impulse pada area Sub Assembly Door Trim untuk meningkatkan efisiensi dan kualitas proses produksi komponen interior otomotif. Robot ini berfungsi melakukan proses impulse welding pada material berbahan resin sehingga keandalan kinerjanya sangat berpengaruh terhadap kelancaran produksi. Oleh karena itu, diperlukan sistem pemeliharaan yang tepat untuk meminimalkan gangguan dan downtime.&#13;
&#13;
Laporan kerja praktik ini bertujuan menganalisis penerapan Preventive Maintenance dan Corrective Maintenance pada Automatic Arm Robot Impulse. Metode yang digunakan meliputi observasi lapangan, wawancara dengan teknisi dan operator, serta studi literatur. Hasil analisis menunjukkan bahwa preventive maintenance telah dilakukan melalui inspeksi bulanan pada komponen utama robot, namun frekuensi inspeksi yang terbatas menyebabkan masih terjadinya gangguan operasional. Selama periode pengamatan, corrective maintenance menunjukkan waktu downtime yang lebih tinggi dibandingkan preventive maintenance.
</summary>
<dc:date>2025-12-12T00:00:00Z</dc:date>
</entry>
</feed>
