<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0">
<channel>
<title>STUDENT INTERNSHIP REPORT (ME)</title>
<link>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/68</link>
<description>Collections of Mechanical Engineering Student Internship Report</description>
<pubDate>Sun, 19 Apr 2026 09:44:18 GMT</pubDate>
<dc:date>2026-04-19T09:44:18Z</dc:date>
<image>
<title>STUDENT INTERNSHIP REPORT (ME)</title>
<url>http://localhost:80/xmlui/bitstream/id/7e5f3317-084d-4514-be33-2b4c646941bc/</url>
<link>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/68</link>
</image>
<item>
<title>ANALISIS HASIL PENGELASAN PIPA DENGAN METODE NON DESTRUCTIVE TEST (NDT) MENGGUNAKAN SINAR GAMMA RAY DI PT. RAGA  UTAMA PERKASA, CILEGON</title>
<link>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15424</link>
<description>ANALISIS HASIL PENGELASAN PIPA DENGAN METODE NON DESTRUCTIVE TEST (NDT) MENGGUNAKAN SINAR GAMMA RAY DI PT. RAGA  UTAMA PERKASA, CILEGON
Mahesa Putra, Muhammad Raga; Mahesa Putra, Muhammad Raga
</description>
<pubDate>Wed, 04 Feb 2026 00:00:00 GMT</pubDate>
<guid isPermaLink="false">https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15424</guid>
<dc:date>2026-02-04T00:00:00Z</dc:date>
</item>
<item>
<title>ANALISI KEGAGALAN PADA ROBOT SUB ASSEMBLY LINI PERAKITAN QUARTER TRIM DI AREA FACTORY 2 PT SUGITY CREATIVES MENGGUNAKAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA)</title>
<link>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15423</link>
<description>ANALISI KEGAGALAN PADA ROBOT SUB ASSEMBLY LINI PERAKITAN QUARTER TRIM DI AREA FACTORY 2 PT SUGITY CREATIVES MENGGUNAKAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA)
Pratama, Aditya
</description>
<pubDate>Sun, 04 Jan 2026 00:00:00 GMT</pubDate>
<guid isPermaLink="false">https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15423</guid>
<dc:date>2026-01-04T00:00:00Z</dc:date>
</item>
<item>
<title>Studi Penerapan Quick Service Maintenance di Workshop Hyundai  Gowa : Standar Operasional, Implementasi di Lapangan dan  Analisis Perbandingan dengan Preventive Maintenance</title>
<link>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15348</link>
<description>Studi Penerapan Quick Service Maintenance di Workshop Hyundai  Gowa : Standar Operasional, Implementasi di Lapangan dan  Analisis Perbandingan dengan Preventive Maintenance
Adi Kusuma Putra, Hartanto
</description>
<pubDate>Fri, 30 Jan 2026 00:00:00 GMT</pubDate>
<guid isPermaLink="false">https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15348</guid>
<dc:date>2026-01-30T00:00:00Z</dc:date>
</item>
<item>
<title>ANALISIS PENERAPAN PREVENTIVE DAN  CORRECTIVE MAINTENANCE PADA AUTOMATIC  ARM ROBOT IMPULSE DI AREA SUB ASSEMBLY  DOOR TRIM FACTORY 2 PT SUGITY CREATIVES</title>
<link>https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15287</link>
<description>ANALISIS PENERAPAN PREVENTIVE DAN  CORRECTIVE MAINTENANCE PADA AUTOMATIC  ARM ROBOT IMPULSE DI AREA SUB ASSEMBLY  DOOR TRIM FACTORY 2 PT SUGITY CREATIVES
PT Sugity Creatives telah menerapkan Automatic Arm Robot Impulse pada area Sub Assembly Door Trim untuk meningkatkan efisiensi dan kualitas proses produksi komponen interior otomotif. Robot ini berfungsi melakukan proses impulse welding pada material berbahan resin sehingga keandalan kinerjanya sangat berpengaruh terhadap kelancaran produksi. Oleh karena itu, diperlukan sistem pemeliharaan yang tepat untuk meminimalkan gangguan dan downtime.&#13;
&#13;
Laporan kerja praktik ini bertujuan menganalisis penerapan Preventive Maintenance dan Corrective Maintenance pada Automatic Arm Robot Impulse. Metode yang digunakan meliputi observasi lapangan, wawancara dengan teknisi dan operator, serta studi literatur. Hasil analisis menunjukkan bahwa preventive maintenance telah dilakukan melalui inspeksi bulanan pada komponen utama robot, namun frekuensi inspeksi yang terbatas menyebabkan masih terjadinya gangguan operasional. Selama periode pengamatan, corrective maintenance menunjukkan waktu downtime yang lebih tinggi dibandingkan preventive maintenance.
</description>
<pubDate>Fri, 12 Dec 2025 00:00:00 GMT</pubDate>
<guid isPermaLink="false">https://library.universitaspertamina.ac.id//xmlui/handle/123456789/15287</guid>
<dc:date>2025-12-12T00:00:00Z</dc:date>
</item>
</channel>
</rss>
