Show simple item record

dc.contributor.authorAMALLA, QUENE
dc.date.accessioned2024-08-07T03:05:07Z
dc.date.available2024-08-07T03:05:07Z
dc.date.issued2024-02-21
dc.identifier.urihttps://library.universitaspertamina.ac.id//xmlui/handle/123456789/12102
dc.description.abstractThis research is intended to analyze the production support line, namely the part supply settings at PT Astra Daihatsu Motor. The approach used is Ranked Position Weight (RPW) which is used to analyze the level of efficiency of a production line. The analysis results show that using the RPW approach provides results that can increase the level of production efficiency by 6%. Apart from increasing line efficiency, this approach produces results that reduce the balance delay value by 6%. And also this research provides a reduction in idle time calculations, which means it provides efficient results for production support linesen_US
dc.subjectBalance Delay, Idle time, Production, Line efficiencyen_US
dc.titleAnalisis Setting Part Supply pada Support Lane Produksi Menggunakkan Metode Line Balancing di PT Astra Daihatsu Motor Assembly Planten_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record