dc.description.abstract | This research is intended to analyze the production support line, namely the part supply settings at PT Astra Daihatsu Motor. The approach used is Ranked Position Weight (RPW) which is used to analyze the level of efficiency of a production line. The analysis results show that using the RPW approach provides results that can increase the level of production efficiency by 6%. Apart from increasing line efficiency, this approach produces results that reduce the balance delay value by 6%. And also this research provides a reduction in idle time calculations, which means it provides efficient results for production support lines | en_US |
dc.subject | Balance Delay, Idle time, Production, Line efficiency | en_US |
dc.title | Analisis Setting Part Supply pada Support Lane Produksi Menggunakkan Metode Line Balancing di PT Astra Daihatsu Motor Assembly Plant | en_US |