METODE PENGUJIAN BORE PILE (PILE DRIVING ANALYZER DAN PILE INTEGRITY TEST) PADA PROYEK LRT FASE 1B VELODROME-MANGGARAI
dc.contributor.author | Sitanggang, Andrian Badia Raja | |
dc.date.accessioned | 2025-08-14T07:55:34Z | |
dc.date.available | 2025-08-14T07:55:34Z | |
dc.date.issued | 2024-10-31 | |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/14804 | |
dc.language.iso | other | en_US |
dc.title | METODE PENGUJIAN BORE PILE (PILE DRIVING ANALYZER DAN PILE INTEGRITY TEST) PADA PROYEK LRT FASE 1B VELODROME-MANGGARAI | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (CV)
Collections of Civil Engineering Students' Internship Report