ANALISIS PENERAPAN K3 PADA PROYEK CENTRAL JAVA PLANT – POU CHEN GROUP DENGAN METODE ERECTION PADA PENGERJAAN LIFTING
| dc.contributor.author | Armanda, Rangga Fikri | |
| dc.date.accessioned | 2025-08-15T04:58:45Z | |
| dc.date.available | 2025-08-15T04:58:45Z | |
| dc.date.issued | 2023-10-27 | |
| dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/14893 | |
| dc.language.iso | other | en_US |
| dc.publisher | Rangga Fikri Armanda | en_US |
| dc.title | ANALISIS PENERAPAN K3 PADA PROYEK CENTRAL JAVA PLANT – POU CHEN GROUP DENGAN METODE ERECTION PADA PENGERJAAN LIFTING | en_US |
| dc.type | Technical Report | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (CV)
Collections of Civil Engineering Students' Internship Report
