UPAYA INSPEKSI DALAM MENCEGAH DAMPAK KERUSAKAN AIR CYCLE MACHINE DI P.T. GARUDA INDONESIA (PERSERO)
dc.contributor.author | Syahrin, Laode Iman | |
dc.date.accessioned | 2021-02-17T04:01:30Z | |
dc.date.available | 2021-02-17T04:01:30Z | |
dc.date.issued | 2019-12-20 | |
dc.identifier.citation | APA 6th | en_US |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/3093 | |
dc.description | Laporan ini akan membahas tentang menentukan waktu replacement komponen air cycle machine (ACM) pesawat terbang Boeing 737 serta studi kelayakan ekonomis dari upaya inspeksi untuk ACM. | en_US |
dc.language.iso | other | en_US |
dc.subject | ACM | en_US |
dc.subject | Aviation | en_US |
dc.subject | Garuda Indonesia | en_US |
dc.subject | Inspection | en_US |
dc.subject | Reliability | en_US |
dc.title | UPAYA INSPEKSI DALAM MENCEGAH DAMPAK KERUSAKAN AIR CYCLE MACHINE DI P.T. GARUDA INDONESIA (PERSERO) | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (ME)
Collections of Mechanical Engineering Students' Internship Report