PENGAMATAN PROSES KERJA DAN SISTEM INSTRUMENTASI PADA BOILER TIPE WANSON DI PPSDM MIGAS CEPU
dc.contributor.author | Alfi Fadhilah, Rayhan | |
dc.contributor.author | Alfi Fadhilah, Rayhan | |
dc.date.accessioned | 2021-09-01T10:43:04Z | |
dc.date.available | 2021-09-01T10:43:04Z | |
dc.date.issued | 2020-10 | |
dc.identifier.citation | APA | en_US |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/4239 | |
dc.publisher | Rayhan Alfi Fadhilah | en_US |
dc.title | PENGAMATAN PROSES KERJA DAN SISTEM INSTRUMENTASI PADA BOILER TIPE WANSON DI PPSDM MIGAS CEPU | en_US |
dc.type | Working Paper | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (ME)
Collections of Mechanical Engineering Students' Internship Report