METODE PELAKSANAAN ERECTION PC HOLLOW GIRDER PATIMBAN PORT DEVELOPMENT (I) PROJECT PACKAGE 3: CONNECTING BRIDGE
dc.contributor.author | Mawarni, Affifah | |
dc.date.accessioned | 2021-12-31T00:51:41Z | |
dc.date.available | 2021-12-31T00:51:41Z | |
dc.date.issued | 2021-11-30 | |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/5133 | |
dc.language.iso | other | en_US |
dc.title | METODE PELAKSANAAN ERECTION PC HOLLOW GIRDER PATIMBAN PORT DEVELOPMENT (I) PROJECT PACKAGE 3: CONNECTING BRIDGE | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (CV)
Collections of Civil Engineering Students' Internship Report