PEMASANGAN PIPA CROSSING MENGGUNAKAN METODE HORIZONTAL DIRECTIONAL DRILLING (HDD)
dc.contributor.author | Hilman Hanafi Rusly, Muhammad | |
dc.date.accessioned | 2022-02-16T05:47:36Z | |
dc.date.available | 2022-02-16T05:47:36Z | |
dc.date.issued | 2022-02-16 | |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/5335 | |
dc.title | PEMASANGAN PIPA CROSSING MENGGUNAKAN METODE HORIZONTAL DIRECTIONAL DRILLING (HDD) | en_US |
dc.title.alternative | PROYEK : PEMBANGUNAN JALUR PIPA CROSSING JALAN JAMPEA PT. PERTAMINA (PERSERO) | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (CV)
Collections of Civil Engineering Students' Internship Report