Metode Pelaksanaan Pekerjaan Pemancangan Dengan Hydraulic Static Pile Driver dan Drop Hammer
| dc.contributor.author | Nasution, Aldi Aditya | |
| dc.date.accessioned | 2022-03-21T14:11:48Z | |
| dc.date.available | 2022-03-21T14:11:48Z | |
| dc.date.issued | 2019-07-03 | |
| dc.identifier.citation | APA Citation | en_US | 
| dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/6007 | |
| dc.language.iso | other | en_US | 
| dc.publisher | Aldi Aditya Nasution | en_US | 
| dc.subject | Hydraulic Static Pile Driver | en_US | 
| dc.subject | Pemancangan | en_US | 
| dc.subject | Drop Hammer | en_US | 
| dc.title | Metode Pelaksanaan Pekerjaan Pemancangan Dengan Hydraulic Static Pile Driver dan Drop Hammer | en_US | 
| dc.type | Other | en_US | 
Files in this item
This item appears in the following Collection(s)
- 
STUDENTS INTERNSHIP REPORT (CV)
 Collections of Civil Engineering Students' Internship Report
