• Login
    Search 
    •   DSpace Home
    • FACULTY OF INDUSTRIAL TECHNOLOGY
    • CHEMICAL ENGINEERING (TEKNIK KIMIA)
    • STUDENTS INTERNSHIP REPORT (CE)
    • Search
    •   DSpace Home
    • FACULTY OF INDUSTRIAL TECHNOLOGY
    • CHEMICAL ENGINEERING (TEKNIK KIMIA)
    • STUDENTS INTERNSHIP REPORT (CE)
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 41-50 of 113

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    Evaluasi Kinerja Heat Exchanger 31-HE-102 Unit 31 DI PT.PERTAMINA RU VI Balongan Periode Februari - Maret 2023 

    Algivary, Brilian (2023)
    Thumbnail

    ANALISA PRESSURE DROP DAN FRICTION LOSS PADA SISTEM PERPIPAAN PROSES PENJERNIHAN AIR SUNGAI PT YUASA BATTERY INDONESIA 

    Unknown author (2023-08-06)
    Thumbnail

    DESAIN ALAT ADSORBER UNTUK PROSES PENGERINGAN ADSORPSI DENGAN MEDIA UDARA PANAS PANAS PADA UNIT CLINKER TUBAN 1 

    Gabriel, Margaretha Desy (2023-08-09)
    Thumbnail

    LAPORAN KERJA PRAKTIK EVALUASI KINERJA HEAT EXCHANGER 21-E-104 PADA UNIT KEROSINE HYDROTREATING UNIT 

    Unknown author (2023)
    Unit Kerosine Hydrotreating (Kero-HTU) merupakan bagian dari unit HTU pada RU VI Balongan yang mengolah kerosin dari CDU menjadi produk yang lebih stabil dan tidak korosif dengan proses Catalytic hydrotreating. Heat ...
    Thumbnail

    EVALUASI KINERJA COMBINE FEED EXCHANGER 14 E-101 A/B PADA UNIT GAS OIL HYDROTREATING UNIT (GO HTU) 

    Nuralifah, Riza (2023)
    Thumbnail

    EFISIENSI KINERJA MIXED BED DEMINERALIZED DAN RESIN ION EXCHANGE TERHADAP KUALITAS AIR DEMINERAL WATER TREATMENT PLANT UNIT 3 (1 X 660) MW PT. SUMBER SEGARA PRIMADAYA (PLTU) CILACAP 

    Unknown author (2023-08-30)
    Thumbnail

    Laporan Umum Kerja Praktik Dengan Studi Kasus 

    Fadli Fahri, M Fadia (2023-06-13)
    Thumbnail

    EVALUASI KINERJA HEAT EXCHANGER 15-E-101 PADA UNIT RESIDUE CATALYTIC CRACKING (RCC) 

    De Nasti, Al Nadine (Al Nadine De Nasti, 2023-09-19)
    Thumbnail

    EVALUASI KINERJA RECYCLE COMPRESSOR (32-K-101) PADA PLATFORMING UNIT - NPU 

    Siburian, Kyfti Yolanda (2023-08-03)
    Thumbnail

    EVALUASI KINERJA HEAT EXCHANGER 15-E-105 PADA RESIDUE CATALYTIC CRACKING (RCC) DI PT KILANG PERTAMINA INTERNASIONAL (KPI) RU VI BALONGAN 

    Unknown author (2023-08-03)
    • «
    • 1
    • . . .
    • 2
    • 3
    • 4
    • 5
    • 6
    • 7
    • 8
    • . . .
    • 12
    • »

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Discover

    AuthorHardiane, Egiana Reshi (3)Pattikawa, Sifra Christhallia (3)Aprilio, Kelvin (2)Azzahra, Salsabila Isthiana (2)Fahreza, Muhammad Akbar (2)Febriana, Eviona (2)Gabriel, Margaretha Desy (2)Kurniasih, Shilpya (2)Muttaqin, Muhammad Alip (2)Nurrohmah, Fitria Ayu (2)... View MoreSubjectLaporan KP (34)Laporan Kerja Praktik (4)Cooling Tower (3)Biocide (2)Heat Exchanger (2)Kerja Praktik (2)kerja praktik, limbah agar-agar, karbon aktif (2)Laporan Kerja Praktek (2)ASPEN HYSYS (1)Aspen Plus (1)... View MoreDate Issued
    2023 (113)
    Has File(s)true (113)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV