• Login
    View Item 
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • STUDENTS INTERNSHIP REPORT (CV)
    • View Item
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • STUDENTS INTERNSHIP REPORT (CV)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Metode Pelaksanaan Pekerjaan Boredpile Pada Proyek Pembangunan Gedung UBM Tower

    Thumbnail
    View/Open
    104117090_Muhammad Rezano Abyasa_Laporan Kerja Praktik.pdf (6.163Mb)
    104117090_Muhammad Rezano Abyasa_Laporan Kerja Praktik.pdf (6.163Mb)
    Laporan Kerja Praktik_Muhammad Rezano Abyasa.pdf (6.163Mb)
    Laporan Kerja Praktik_Muhammad Rezano Abyasa.pdf (6.163Mb)
    Date
    2023-03-27
    Author
    Abyasa, Muhammad Rezano
    Metadata
    Show full item record
    Abstract
    Laporan kerja praktik ini membahas tentang metode pelaksanaan pekerjaan pondasi boredpile pada proyek pembangunan gedung UBM Tower, Alam Sutera, Tangerang. Dalam pekerjaan ini pekerjaan lapangan lebih cepat daripada yang direncanakan, sehingga persiapan untuk pekerjaan tahap selanjutnya dapat terlaksana dengan baik.
    URI
    https://library.universitaspertamina.ac.id//xmlui/handle/123456789/8780
    Collections
    • STUDENTS INTERNSHIP REPORT (CV)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV