• Login
    View Item 
    •   DSpace Home
    • FACULTY OF INDUSTRIAL TECHNOLOGY
    • CHEMICAL ENGINEERING (TEKNIK KIMIA)
    • STUDENTS PAPER (CE)
    • View Item
    •   DSpace Home
    • FACULTY OF INDUSTRIAL TECHNOLOGY
    • CHEMICAL ENGINEERING (TEKNIK KIMIA)
    • STUDENTS PAPER (CE)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    PRARANCANGAN PABRIK BIODIESEL DARI WASTE COOKING OIL DENGAN KAPASITAS 50.000 TON/TAHUN

    Thumbnail
    View/Open
    Laporan DPK Kelompok 12.pdf (4.785Mb)
    PEFD Kelompok 12 2022-1.pdf (216.7Kb)
    Date
    2023
    Author
    Nurrohmah, Fitria Ayu
    Prameswari, Sendang
    Sukma, Fisabil Prawira
    Metadata
    Show full item record
    Abstract
    The increasing need for fuel oil (BBM) in Indonesia is something that cannot be avoided and will increase from year to year. Biodiesel is an alternative energy to replace fossil fuels from transesterification of vegetable oil with methanol. The abundant availability of biodiesel raw materials such as Waste Cooking Oil makes a distinct advantage for Indonesia. The processes used to manufacture biodiesel from used cooking oil are esterification and transesterification. The esterification process functions to convert free fatty acids (FFA) into methyl esters (biodiesel) and water, while the next process is transesterification to convert triglycerides into methyl esters (biodiesel) and glycerol. The location of the factory will be established in the Maloy Batuta Trans Kalimantan Special Economic Zone (KEK MBTK), Bengalon District, East Kutai Regency, East Kalimantan Province. To operate this factory, a workforce of 207 people is needed with a Public Limited Company as a form of business entity. This company will be led by a main director with a line and staff system as the structure of the leadership system. In this factory, the fixed capital investment is IDR 350,376,103,661.66. ROI before tax is 52.55% and ROI after tax is 33.25%. While POT before tax is 2.1543 years and after tax is 3.404 years. Break Even Point (BEP) of 18.00% and Shut Down Point (SDP) of 10.66% of production capacity. Obtained IRR of 16.66%. From the economic analysis, it can be concluded that a biodiesel plant with a capacity of 50,000 tons/year is feasible to build.
    URI
    https://library.universitaspertamina.ac.id//xmlui/handle/123456789/8973
    Collections
    • STUDENTS PAPER (CE)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV