    PRARANCANGAN PABRIK PUPUK UREA DARI AMMONIA DAN KARBON DIOKSIDA DENGAN METODE PROCESS FOR COST AND ENERGY SAVING 21 (ACES21) KAPASITAS 60.000 TON/TAHUN

    Thumbnail
    View/Open
    Main Paper (6.474Mb)
    PEFD (3.068Mb)
    Date
    2023
    Author
    Ramdanu Zaman, Dani
    Naufal Maharani, Fathika
    Karina Tarigan, Sri
    Metadata
    Show full item record
    Abstract
    Urea fertilizer is one of the commodities needed by Indonesian farmers. Design of a urea plant with ammonia and carbon dioxide raw materials using the Process for Cost and Energy Saving 21 method with a capacity of 60,000 tons/year. The factory will be built in Banggai Regency, Central Sulawesi and will be built on land with a total area of 43,650 m2 and a total of 135 factory employees. The raw materials in the form of ammonia and carbon dioxide need as much as 5985.5349 kg/hour of ammonia and 5928.7557 kg/hour of carbon dioxide. The production process takes place at a temperature of 183 °C and at a pressure of 173 atm in a continuous bubble reactor. The reaction for the formation of carbamate by ammonia and carbon dioxide is exothermic and the reaction for the formation of urea from carbamate is endothermic. Utility needs in the production process include the need for steam generator water of 29494.94066 kg/hour, process water requirement of 867235.042 kg/hour and electricity for the needs of process equipment and utilities of 884 kWh. From the calculation of the economic evaluation, it was found that the required total capital investment was IDR 4,149,805,754,082 and working capital was IDR 3,204,179,811,496. At 100% production capacity, the value of ROIb is 30.78%, ROIa is 23.08%, POTb is 3.24 years, POTa is 4.33 years, BEP is 21.95%, SDP is 19.15% and IRR is 23.88%. From the results of this economic analysis and supported by Indonesia's stable economy, a urea plant with a production capacity of 60,000 tin per year is feasible to build in Indonesia.
    URI
    https://library.universitaspertamina.ac.id//xmlui/handle/123456789/8977
    Collections
    • STUDENTS PAPER (CE)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV