METODE PELAKSANAAN PEKERJAAN STRUKTUR KOLOM PADA PROYEK SHOWROOM DAN BENGKEL PT HYUNDAI MOBIL INDONESIA
dc.contributor.author | Waradana, Naufal Gyda | |
dc.date.accessioned | 2023-08-09T02:26:45Z | |
dc.date.available | 2023-08-09T02:26:45Z | |
dc.date.issued | 2022-01-19 | |
dc.identifier.citation | APA Citation | en_US |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/9300 | |
dc.title | METODE PELAKSANAAN PEKERJAAN STRUKTUR KOLOM PADA PROYEK SHOWROOM DAN BENGKEL PT HYUNDAI MOBIL INDONESIA | en_US |
dc.type | Other | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (CV)
Collections of Civil Engineering Students' Internship Report