ANALISIS OVERALL EQUIPMENT EFFECTIVENESS (OEE) DALAM MEMINIMALISI SIX BIG LOSSES PADA ALAT VISCOMETER AUTHOMATIC ISL ASTM D-7279 LABORATORIUM PT. PERTAMINA LUBRICANTS PRODUCTION UNIT CILACAP
dc.contributor.author | Marwa, Angga | |
dc.date.accessioned | 2023-08-30T07:43:12Z | |
dc.date.available | 2023-08-30T07:43:12Z | |
dc.date.issued | 2022 | |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/9665 | |
dc.subject | OEE | en_US |
dc.title | ANALISIS OVERALL EQUIPMENT EFFECTIVENESS (OEE) DALAM MEMINIMALISI SIX BIG LOSSES PADA ALAT VISCOMETER AUTHOMATIC ISL ASTM D-7279 LABORATORIUM PT. PERTAMINA LUBRICANTS PRODUCTION UNIT CILACAP | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (CE)
Collections of Chemical Engineering Students' Internship Report