• Login
    View Item 
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • LECTURERS PAPER (CV)
    • View Item
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • LECTURERS PAPER (CV)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Metode Pelaksanaan Bore Pile Pada Pekerjaan Pondasi Dalam Di Gedung Oil Movement KPI RU-V Untuk Perluasan Bangunan

    Thumbnail
    View/Open
    Metode Pelaksanaan Bore Pile Pada Pekerjaan Pondasi Dalam Di Gedung Oil Movement KPI RU-V Untuk Perluasan Bangunan_Laporan Kerja Praktik_Sitti Fatimah_104120061.pdf (4.496Mb)
    Date
    2024-03-25
    Author
    Fatimah, Sitti
    Metadata
    Show full item record
    URI
    https://library.universitaspertamina.ac.id//xmlui/handle/123456789/11642
    Collections
    • LECTURERS PAPER (CV)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV