Metode Pelaksanaan Bore Pile Pada Pekerjaan Pondasi Dalam Di Gedung Oil Movement KPI RU-V Untuk Perluasan Bangunan
dc.contributor.author | Fatimah, Sitti | |
dc.date.accessioned | 2024-03-25T16:08:18Z | |
dc.date.available | 2024-03-25T16:08:18Z | |
dc.date.issued | 2024-03-25 | |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/11642 | |
dc.title | Metode Pelaksanaan Bore Pile Pada Pekerjaan Pondasi Dalam Di Gedung Oil Movement KPI RU-V Untuk Perluasan Bangunan | en_US |
Files in this item
This item appears in the following Collection(s)
-
LECTURERS PAPER (CV)
Collections of Civil Engineering Lecturers' Paper