• Login
    View Item 
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • STUDENTS INTERNSHIP REPORT (CV)
    • View Item
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • STUDENTS INTERNSHIP REPORT (CV)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    TINJAUAN QUALITY CONTROL BOX GIRDER PADA PROYEK JEMBATAN CISADANE PIK 2 EXTENSION

    Thumbnail
    View/Open
    LaporanKerjaPraktik_A.ZulfahmiEriSusanto_104120015..pdf (2.751Mb)
    Date
    2023-11-10
    Author
    Susanto, A. Zulfahmi Eri
    Metadata
    Show full item record
    Abstract
    The construction of prestressed bridges using the balance cantilever method offers an effective solution to meet the demand for safe, efficient, and sustainable transportation infrastructure. However, the success of this method largely depends on the strict implementation of quality control, particularly on box girder elements. This study aims to understand workplace standards and professionalism in the field while applying theoretical knowledge in practical settings. Specifically, the research focuses on examining the workflow and stages of box girder quality control in the Cisadane PIK 2 Extension Bridge project. The findings show that the quality control process in this project is carried out systematically through a series of stages, including inspections of the form traveller method, reinforcement checklist, tendon installation, casting, stressing, and grouting, as well as preparation and execution of form traveller launching. Each stage is accompanied by detailed inspection procedures to ensure dimensional accuracy, material quality, and compliance with applicable technical standards. The implementation of quality control in box girder production is conducted under strict supervision and with high precision in accordance with established quality standards, contributing significantly to the success of the Cisadane PIK 2 Extension Bridge project.
    URI
    https://library.universitaspertamina.ac.id//xmlui/handle/123456789/14714
    Collections
    • STUDENTS INTERNSHIP REPORT (CV)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV