Show simple item record

dc.contributor.authorSusanto, A. Zulfahmi Eri
dc.date.accessioned2025-08-13T09:42:39Z
dc.date.available2025-08-13T09:42:39Z
dc.date.issued2023-11-10
dc.identifier.urihttps://library.universitaspertamina.ac.id//xmlui/handle/123456789/14714
dc.descriptionKerja Praktik ini dilaksanakan pada proyek pembangunan Jembatan Cisadane PIK 2 Extension yang dikerjakan oleh PT Wijaya Karya (Persero) Tbk. Proyek ini berlokasi di kawasan PIK 2, Tangerang, Banten. Struktur jembatan yang dibangun merupakan jembatan prategang dengan metode balance cantilever, yang dipilih karena mampu memenuhi kebutuhan infrastruktur transportasi yang aman, efisien, dan berkelanjutan dengan waktu konstruksi yang relatif singkat serta gangguan minimal terhadap lalu lintas. Tujuan dari kerja praktik ini adalah untuk memahami standar kerja dan profesionalisme di lapangan, sekaligus menerapkan pengetahuan yang diperoleh selama perkuliahan ke dalam kondisi nyata. Secara khusus, kegiatan kerja praktik difokuskan pada mempelajari alur dan tahapan quality control pada elemen box girder, mulai dari pemeriksaan metode form traveller, pengecekan pembesian, instalasi tendon, pengecoran, stressing, grouting, hingga persiapan dan pelaksanaan launching form traveller.en_US
dc.description.abstractThe construction of prestressed bridges using the balance cantilever method offers an effective solution to meet the demand for safe, efficient, and sustainable transportation infrastructure. However, the success of this method largely depends on the strict implementation of quality control, particularly on box girder elements. This study aims to understand workplace standards and professionalism in the field while applying theoretical knowledge in practical settings. Specifically, the research focuses on examining the workflow and stages of box girder quality control in the Cisadane PIK 2 Extension Bridge project. The findings show that the quality control process in this project is carried out systematically through a series of stages, including inspections of the form traveller method, reinforcement checklist, tendon installation, casting, stressing, and grouting, as well as preparation and execution of form traveller launching. Each stage is accompanied by detailed inspection procedures to ensure dimensional accuracy, material quality, and compliance with applicable technical standards. The implementation of quality control in box girder production is conducted under strict supervision and with high precision in accordance with established quality standards, contributing significantly to the success of the Cisadane PIK 2 Extension Bridge project.en_US
dc.subjectPrestressed Bridges, Balance Cantilever, Quality Control, Box Girderen_US
dc.titleTINJAUAN QUALITY CONTROL BOX GIRDER PADA PROYEK JEMBATAN CISADANE PIK 2 EXTENSIONen_US
dc.typeWorking Paperen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record