• Login
    View Item 
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • STUDENTS INTERNSHIP REPORT (CV)
    • View Item
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • STUDENTS INTERNSHIP REPORT (CV)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Perbandingan Pondasi Tiang Pancang (Spun Pile) Dan Pondasi Bore Pile Pada Proyek Jalan Tol Cisumdawu Phase II STA 19+050 Sumedang Jawa Barat

    Thumbnail
    View/Open
    LaporanKP_AgusSaefudin_104117005_TolCisumdawuSumedang.pdf (3.324Mb)
    Date
    2021-01-04
    Author
    Saefudin, Agus
    Metadata
    Show full item record
    Abstract
    In this report, it aims to compare the method of spun pile and bore pile implementation, axial bearing strength of piles, and construction costs. The analysis result of the implementation method turns out that the spun pile is faster than the bore pile when viewed from one installation. Then in terms of strength, one spun pile pile to withstand loads greater than the bore pile including 3,385.06 kN (ABT-1), 2,869.22 kN (ABT-2), and 2,298.93 kN (PIER-1). Furthermore, in terms of construction costs, the spun pile foundation is IDR. 1,857,875,120.00, while the bore pile is IDR. 2,677,640,299.00. There is a difference in cost of IDR 809,765,179.00 or 43.6% more economical if you use a spun pile.
    URI
    https://library.universitaspertamina.ac.id//xmlui/handle/123456789/2668
    Collections
    • STUDENTS INTERNSHIP REPORT (CV)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV