• Login
    View Item 
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • STUDENTS INTERNSHIP REPORT (CV)
    • View Item
    •   DSpace Home
    • FACULTY OF INFRASTRUCTURE PLANNING
    • CIVIL ENGINEERING (TEKNIK SIPIL)
    • STUDENTS INTERNSHIP REPORT (CV)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Metode Pelaksanaan Pekerjaan Pemancangan Dengan Hydraulic Static Pile Driver dan Drop Hammer

    Thumbnail
    View/Open
    Laporan Kerja Praktik Aldi Aditya Nasution 104116037 CV2016.pdf (2.603Mb)
    Date
    2019
    Author
    Nasution, Aldi Aditya
    Metadata
    Show full item record
    URI
    https://library.universitaspertamina.ac.id//xmlui/handle/123456789/273
    Collections
    • STUDENTS INTERNSHIP REPORT (CV)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV