Metode Pelaksanaan Pekerjaan Pemancangan Dengan Hydraulic Static Pile Driver dan Drop Hammer
dc.contributor.author | Nasution, Aldi Aditya | |
dc.date.accessioned | 2019-12-19T09:08:29Z | |
dc.date.available | 2019-12-19T09:08:29Z | |
dc.date.issued | 2019 | |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/273 | |
dc.language.iso | other | en_US |
dc.subject | Pemancangan Pondasi | en_US |
dc.title | Metode Pelaksanaan Pekerjaan Pemancangan Dengan Hydraulic Static Pile Driver dan Drop Hammer | en_US |
dc.type | Article | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (CV)
Collections of Civil Engineering Students' Internship Report