• Login
    View Item 
    •   DSpace Home
    • FACULTY OF INDUSTRIAL TECHNOLOGY
    • LOGISTICS ENGINEERING (TEKNIK LOGISTIK)
    • STUDENTS INTERNSHIP REPORT (LG)
    • View Item
    •   DSpace Home
    • FACULTY OF INDUSTRIAL TECHNOLOGY
    • LOGISTICS ENGINEERING (TEKNIK LOGISTIK)
    • STUDENTS INTERNSHIP REPORT (LG)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    PENERAPAN CRITICAL PATH METHOD DALAM PENJADWALAN PROYEK PENGEMBANGAN SISTEM INFORMASI DI PT ALADDIN TEKNOLOGI SOLUSI (Studi Kasus: Pengembangan Vendor Management System di PT XYZ)

    Thumbnail
    View/Open
    Laporan KP Final_102417071_Aradhana Raditya P-Repo.pdf (1.148Mb)
    Date
    2021-04-16
    Author
    Pratisto, Aradhana Raditya
    Metadata
    Show full item record
    URI
    https://library.universitaspertamina.ac.id//xmlui/handle/123456789/3727
    Collections
    • STUDENTS INTERNSHIP REPORT (LG)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV