PENERAPAN CRITICAL PATH METHOD DALAM PENJADWALAN PROYEK PENGEMBANGAN SISTEM INFORMASI DI PT ALADDIN TEKNOLOGI SOLUSI (Studi Kasus: Pengembangan Vendor Management System di PT XYZ)
dc.contributor.author | Pratisto, Aradhana Raditya | |
dc.date.accessioned | 2021-06-07T11:49:04Z | |
dc.date.available | 2021-06-07T11:49:04Z | |
dc.date.issued | 2021-04-16 | |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/3727 | |
dc.language.iso | other | en_US |
dc.title | PENERAPAN CRITICAL PATH METHOD DALAM PENJADWALAN PROYEK PENGEMBANGAN SISTEM INFORMASI DI PT ALADDIN TEKNOLOGI SOLUSI (Studi Kasus: Pengembangan Vendor Management System di PT XYZ) | en_US |
dc.title.alternative | IMPLEMENTATION OF CRITICAL PATH METHOD IN INFORMATION SYSTEM DEVELOPMENT SCHEDULING IN PT ALADDIN TEKNOLOGI SOLUSI (Study Case: Vendor Management System Development in PT XYZ) | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (LG)
Collections of Logistics Engineering Students' Internship Report