Penentuan Horsepower Drawwork pada Operasi Workover Sumur X Di PT. Rigsis Energi Indonesia
dc.contributor.author | Hanif, Muhammad Daffa | |
dc.date.accessioned | 2021-07-15T07:35:31Z | |
dc.date.available | 2021-07-15T07:35:31Z | |
dc.date.issued | 2021-07-13 | |
dc.identifier.citation | APA | en_US |
dc.identifier.uri | https://library.universitaspertamina.ac.id//xmlui/handle/123456789/4004 | |
dc.language.iso | other | en_US |
dc.publisher | Universitas Pertamina | en_US |
dc.subject | Workover | en_US |
dc.subject | drawwork | en_US |
dc.subject | drilling | en_US |
dc.subject | horsepower | en_US |
dc.subject | rig | en_US |
dc.title | Penentuan Horsepower Drawwork pada Operasi Workover Sumur X Di PT. Rigsis Energi Indonesia | en_US |
dc.type | Working Paper | en_US |
Files in this item
This item appears in the following Collection(s)
-
STUDENTS INTERNSHIP REPORT (PE)
Collections of Petroleum Engineering Students' Internship Report