• Login
    Browsing STUDENTS INTERNSHIP REPORT (LG) by Subject 
    •   DSpace Home
    • FACULTY OF INDUSTRIAL TECHNOLOGY
    • LOGISTICS ENGINEERING (TEKNIK LOGISTIK)
    • STUDENTS INTERNSHIP REPORT (LG)
    • Browsing STUDENTS INTERNSHIP REPORT (LG) by Subject
    •   DSpace Home
    • FACULTY OF INDUSTRIAL TECHNOLOGY
    • LOGISTICS ENGINEERING (TEKNIK LOGISTIK)
    • STUDENTS INTERNSHIP REPORT (LG)
    • Browsing STUDENTS INTERNSHIP REPORT (LG) by Subject
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browsing STUDENTS INTERNSHIP REPORT (LG) by Subject

    • 0-9
    • A
    • B
    • C
    • D
    • E
    • F
    • G
    • H
    • I
    • J
    • K
    • L
    • M
    • N
    • O
    • P
    • Q
    • R
    • S
    • T
    • U
    • V
    • W
    • X
    • Y
    • Z

    Order:

    Results:

    Now showing items 1-20 of 43

    • ascending
    • descending
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
      Subject
      Kaizen, Metode 5S, Implementasi [1]
      Kantong Semen [1]
      Kapal tanker [1]
      Kapasitas [2]
      Kargo, Peramalan, Siklis, Trend Siklis [1]
      Kata kunci : Proses material handling, Kerugian dari segi biaya, dan Total ongkos material handling [1]
      Kata kunci: LSS, regresi linier berganda, waktu perjalanan, jarak perjalanan, cost plus pricing, full costing. [1]
      Kata Kunci: Tambang Batu bara, Sparepart Alat Berat, Total Biaya Persediaan dan Economic Order Quantity. [1]
      Kebijakan persediaan, ordering formula existing, Economic Order Quantity (EOQ [1]
      Kebijakan persediaan, ordering formula existing, Economic Order Quantity (EOQ). [1]
      Kebijakan Produksi [1]
      kebutuhan, metode peramalan, kesalahan, perbandingan [1]
      kecepatan respon, gravity location model, penentuan lokasi, customer satisfaction, service level. [1]
      Kelayakan usaha, profit, IRR, NVP, payback period, produksi, permintaan, pupuk organik cair [1]
      Kelogistikan [1]
      Kemampuan Produksi, Maximum Stock, Min-Max Stock, Minimum Stock, Ullage [2]
      Kendaraan, Pengiriman, Peramalan, Permintaan. [1]
      Kepabeanan, Lean Kaizen, PDCA, PEB, PIB [1]
      Kepner Tregoe Decision Analysis [3]
      Kepuasan Pelanggan [2]
      • «
      • »

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      LoginRegister

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV