Show simple item record

dc.contributor.authorTarigan, Gideon Suranta
dc.date.accessioned2022-09-09T08:39:03Z
dc.date.available2022-09-09T08:39:03Z
dc.date.issued2022-08-08
dc.identifier.urihttps://library.universitaspertamina.ac.id//xmlui/handle/123456789/7069
dc.description.abstractThis research is about designing an electric submersible pump with the aim of increasing the production rate. In addition to the type of pump, several components have been replaced, such as stage, motor, cable size, surface equipment, transformer, and switchboard. The research flow analyzes the data in wells AB and C, constructs the IPR vs VLP curve, and determines the optimum ESP design. The calculated results show that in Well AB, the REDA pump type REDA D-475/106 was replaced with the REDA pump type REDA D2150/95 and well C pump type DN3100/119 was replaced with the pump type REDA D5800N/82. Keywords: ESP Redesign, Optimum flow rate, Stages.en_US
dc.language.isootheren_US
dc.titleDesain Ulang Electric Submersible Pump pada Sumur AB dan Sumur C Lapangan Xen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record