dc.description | Kerja Praktik ini dilaksanakan di PT. PLN (PERSERO) UPDK Pekanbaru, PLTG Teluk Lembu.
Pada kerja praktik ini membahas dan menganalisa tentang metode perawatan turbin gas pada
PT.PLN (PERSERO). Tujuan dari kerja praktik yang telah dilakuan untuk mengetahui metode
perawatan turbin gas pada PT. PLN (PERSERO) dan analisis efektivitas dari metode perawatan
yang digunakan pada PT. PLN ( PERSERO) UPDK, PLTG Teluk Lembu, Pekanbaru. Pada PLTG
Teluk Lembu saat ini menggunakan metode perawatan shut down maintenance karena unit
pembangkit pada PLTG Teluk Lembu saat ini lebih sering stand by dan hanya beroperasi pada saat
dibutuhkan. Dari hasil perhitungan teoritis diperoleh efisiensi 98.25%, dan setelah dilakukan
perawatan dengan metode shutdown maintenance diperoleh nilai perhitungan actual efisiensi turbin
gas PLTG Teluk Lembu sebesar 95.50%. Efisiensi dari turbin gas PLTG Teluk Lembu berkurang
sebesar 3.75 %. Karena nilai efisiensi dari turbin gas tidak berkurang secara signifikan, dapat
disimpulkan untuk saat ini metode perawatan shutdown maintenance masih efektiv untuk kondisi
unit stand by dan hanya beroperasi pada saat dibutuhkan. | en_US |
dc.description.abstract | This practical work is carried out at PT. PLN (PERSERO) UPDK Pekanbaru, PLTG Teluk Lembu.
In this practical work discusses and analyzes the gas turbine maintenance methods at PT. PLN
(PERSERO). The purpose of the practical work that has been carried out is to find out the gas
turbine maintenance method at PT. PLN (PERSERO) and analysis of the effectiveness of the
treatment methods used in PT. PLN ( PERSERO) UPDK, PLTG Teluk Lembu, Pekanbaru. PLTG
Teluk Lembu currently uses the shut down maintenance method because the generating unit at
PLTG is currently more often stand by and only operates when needed. From the results of
theoretical calculations, an efficiency of 98.25% was obtained, and after maintenance with the
shutdown maintenance method, the actual calculation value of the gas turbine efficiency of the
PLTG was obtained by 95.50%. The efficiency of the PLTG Teluk Lembu gas turbine was reduced
by 3.75%. Since the efficiency value of the gas turbine has not been significantly reduced, it can be
concluded that for now the shutdown maintenance method is still effective for the condition of the
stand by unit and only operates when needed. | en_US |
dc.publisher | Universitas Pertamina | en_US |
dc.subject | Perawatan Turbin Gas, Shutdown maintenance, efisiensi Turbin Gas | en_US |
dc.title | Analisa perawatan turbin gas type PG 5341 P Unit 3 PT. PLN (PERSERO) Unit pelaksana pembangkit Pekanbaru Riau PLTG Teluk Lembu | en_US |