Optimasi Produksi Dengan Analisa Keteknikan Penggunaan Lifting ESP Pada Sumur X, Y, dan Z Di Lapangan Prabumulih PT. Pertamina Hulu Rokan
Abstract
Wells X, Y, and Z in the Prabumulih Field of PT. Pertamina Hulu Rokan are wells that have been operating for a long time and have been installed with artificial lift. However, the performance of the installed artificial lift has not yet reached 80% of the optimal total fluid production rate of the three wells. For this reason, artificial lift criteria screening was carried out and an Electrical
Submersible Pump (ESP) was used to increase the optimal production rate at 80% AOFP. In addition, an engineering analysis was carried out to determine the selected artificial lift scenario using the ESP EJP-IND2000 pump type. An increase in oil gain was obtained for the three wells, namely >20 bopd and the fluid production rate of the three wells was >80% of AOFP.