• Login
    View Item 
    •   DSpace Home
    • FACULTY OF EXPLORATION AND PRODUCTION TECHNOLOGY
    • PETROLEUM ENGINEERING (TEKNIK PERMINYAKAN)
    • DISSERTATIONS AND THESES (PE)
    • View Item
    •   DSpace Home
    • FACULTY OF EXPLORATION AND PRODUCTION TECHNOLOGY
    • PETROLEUM ENGINEERING (TEKNIK PERMINYAKAN)
    • DISSERTATIONS AND THESES (PE)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    EVALUASI SISTEM BLOWOUT PREVENTER (BOP) PADA KEGIATAN WORKOVER DI SUMUR X

    Thumbnail
    View/Open
    101321034 - Muhammad Faqih Adli Muzaki - Teknik Perminyakan - LaporanTugasAkhir.pdf (1.818Mb)
    Date
    2025-08-07
    Author
    Adli Muzaki, Muhammad Faqih
    Metadata
    Show full item record
    Abstract
    Workover operations are a critical part of well maintenance activities in the oil and gas industry and carry a high risk of formation pressure control failure. Therefore, evaluation of the Blowout Preventer (BOP) system is essential, as it serves as the primary safety device to ensure operational safety. This study aims to evaluate the compliance of the BOP system used in the workover operations at Well X with the API RP 53 standard, in order to ensure adherence to international standards and enhance safety and operational reliability in the field. The objectives of this research include determining the working pressure at Well X, calculating the accumulator capacity and required reservoir fluid volume, evaluating the BOP system's compliance with the API RP 53 standard, and designing a proper BOP system configuration that meets the standard. The research employs a quantitative descriptive method with an evaluative approach, aiming to assess the suitability of the BOP system in use against API RP 53 requirements. The results show that the BOP system applied to the analyzed well is in accordance with the API RP 53 standard. The recommended BOP stack configuration that complies with the API RP 53 standard for Well X is the 3K – 11 – SRRA setup, consisting of a Cameron Hydril annular 11” 3000 psi, Cameron Type U double ram (shear + VBR) 11” 3000 psi, drilling spool 11” 3000 psi, 2-1/16" choke manifold 3000 psi, 2” choke line 3000 psi, 2” kill line 3000 psi, and an accumulator rated at 3000 psi with a usable volume of 640 liters (169 gallons), 16 bottles, and a reservoir capacity of 1290 liters (340 gallons). Keywords: Evaluation, BOP, API RP 53 Standard
    URI
    https://library.universitaspertamina.ac.id//xmlui/handle/123456789/14266
    Collections
    • DISSERTATIONS AND THESES (PE)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV