Show simple item record

dc.contributor.authorAdli Muzaki, Muhammad Faqih
dc.date.accessioned2025-08-08T02:19:50Z
dc.date.available2025-08-08T02:19:50Z
dc.date.issued2025-08-07
dc.identifier.urihttps://library.universitaspertamina.ac.id//xmlui/handle/123456789/14266
dc.description.abstractWorkover operations are a critical part of well maintenance activities in the oil and gas industry and carry a high risk of formation pressure control failure. Therefore, evaluation of the Blowout Preventer (BOP) system is essential, as it serves as the primary safety device to ensure operational safety. This study aims to evaluate the compliance of the BOP system used in the workover operations at Well X with the API RP 53 standard, in order to ensure adherence to international standards and enhance safety and operational reliability in the field. The objectives of this research include determining the working pressure at Well X, calculating the accumulator capacity and required reservoir fluid volume, evaluating the BOP system's compliance with the API RP 53 standard, and designing a proper BOP system configuration that meets the standard. The research employs a quantitative descriptive method with an evaluative approach, aiming to assess the suitability of the BOP system in use against API RP 53 requirements. The results show that the BOP system applied to the analyzed well is in accordance with the API RP 53 standard. The recommended BOP stack configuration that complies with the API RP 53 standard for Well X is the 3K – 11 – SRRA setup, consisting of a Cameron Hydril annular 11” 3000 psi, Cameron Type U double ram (shear + VBR) 11” 3000 psi, drilling spool 11” 3000 psi, 2-1/16" choke manifold 3000 psi, 2” choke line 3000 psi, 2” kill line 3000 psi, and an accumulator rated at 3000 psi with a usable volume of 640 liters (169 gallons), 16 bottles, and a reservoir capacity of 1290 liters (340 gallons). Keywords: Evaluation, BOP, API RP 53 Standarden_US
dc.language.isootheren_US
dc.subjectBlowout, Blowout Preventer, API RP 53 Standard, Evaluationen_US
dc.titleEVALUASI SISTEM BLOWOUT PREVENTER (BOP) PADA KEGIATAN WORKOVER DI SUMUR Xen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record