PETROLEUM ENGINEERING (TEKNIK PERMINYAKAN): Recent submissions
Now showing items 1041-1060 of 1459
-
TORQUE AND DRAG ANALYSIS IN EXTENDED REACH DRILLING USING LANDMARK SOFTWARE
(2021-08-30)This study discusses the design of extended reach well using data from previous offset horizontal wells. The focus of this research is modeling torque and drag using a simulator to answer how to calibrate the friction ... -
EVALUASI KEGAGALAN CASING PADA SUMUR PANAS BUMI “AIA-1” BERDASARKAN NEW ZEALAND STANDARD DAN API 5CT
(Universitas Pertamina, 2021-08-26)Akhmad Izzat Abidin. 101317028. Casing failure evaluation of geothermal well “AIA-1” based on New Zealand Standard and API 5CT. This research is discussing about casing failure evaluation of geothermal “AIA-1” based on ... -
Analisis Desain Casing Sumur Slimhole Lapangan Panas Bumi dengan Temperatur Tinggi
(Universitas Pertamina, 2021)Surya Abdul Aziz. 101317016. Analisis Desain Casing Sumur Slimhole Lapangan Panas Bumi dengan Temperatur Tinggi. Penelitian ini membahas desain casing sumur panas bumi yang memiliki temperatur tinggi dan menggunakan ukuran ... -
Analisis SPR (Stuck Pipe RIsk) Menggunakan Real-Time Data Untuk Memprediksi Stuck Pipe : Studi Kasus Sumur Panas Bumi Y-3
(Muhammad Kinan Fadrian, 2021-08-19)Dalam operasi pengeboran terdapat non-productive time (NPT) yang dapat meningkatkan biaya. Salah satu permasalahan yang dapat meningkatkan non-productive time adalah stuck pipe. Lebih dari 50% dari total NPT didapatkan ... -
Prosedur Pengerjaan Cabut Kill String Pada Kegiatan Workover Sumur X Pertamina Hulu Energi Tuban East Java
(Universitas Pertamina, 2021-01-12)Sebagian besar sumur di lapangan PHE TEJ adalah sumur tua yang membutuhkan kerja ulang sumur untuk mengembalikan produksinya. Berdasarkan hasil record sumur X terkahir kali dilakukan CO log didapatkan produksi air telah ... -
Pemilihan Jenis Rig untuk Pengeboran Slimhole pada Operasi Pengeboran Eksplorasi Panas Bumi
(2021-08-27)Perancangan/penelitian ini tentang penyusunan decision making process dengan tujuannya menentukan jenis rig yang tepat untuk sebuah proyek eksplorasi panas bumi dengan sumur slimhole dan menguji apakah metode MCDA (Multi ... -
ANALISA HIDROLIKA PENGEBORAN PADA SUMUR SLIMHOLE LAPANGAN PANAS BUMI X
(Hisham Yazid, 2021-08-26)Sumur slimhole merupakan salah satu metode yang digunakan untuk melakukan pengeboran sumur eksplorasi khususnya pada panasbumi (geothermal). Sumur ini dilakukan pengeboran secara vertikal dan tidak menutup kemungkinan ... -
DESAIN MANAGED PRESSURE DRILLING METODE CONSTANT BOTTOM HOLE PRESSURE (CBHP) PADA SUMUR SLIMHOLE DENGAN NARROW DRILLING WINDOW
(2021-08-27)Penelitian ini tentang “Desain Managed Pressure Drilling Metode Constant Bottom Hole Pressure (CBHP) pada Sumur Slimhole dengan Narrow Drilling Window” dengan tujuan mendesain parameter hidrolika yang tepat untuk digunakan ... -
Analisa Hidrolika Pengeboran Pada Operasi Casing While Drilling Untuk Casing Setting 9 5/8" Pada Sumur A Pertamina Hulu Sanga Sanga
(Universitas Pertamina, 2021-08-13)Casing while drilling adalah metode pengeboran dimana casing yang akan dipasang pada target depth akan langsung digunakan sebagai rangkaian drill stringnya. Pada penerapannya casing while drilling memiliki tujuan utamanya ... -
Water-Based Mud Design to Handle Troublesome Formation in SIMON Field
(2021-09-01)This research is about the design of drilling mud on the surface and intermediate section of the SIMON Field to determine the drilling mud system and additive composition that is good for dealing with existing formation ... -
Desain Kombinasi Laju Alir dan Analisis Pengangkatan Cutting pada Pengeboran Aerasi di Sumur Panas Bumi H
(2021-08-31)Penelitian ini tentang desain kombinasi laju alir dan analisis pengangkatan cutting pada pengeboran aerasi di sumur panas bumi H. Tujuan penelitian ini adalah untuk menentukan kombinasi laju alir injeksi udara dan lumpur ... -
Hydraulic Design For Constant Bottom Hole Pressure Managed Pressure Drilling (MPD) Operation In Narrow Drilling Window Well
(Universitas Pertamina, 2021-08-19)Ivan Efendi. 101317063. Hydraulic Design For Constant Bottom Hole Pressure Managed Pressure Drilling (MPD) Operation In Narrow Drilling Window Well. The effect of a mature and depleted oil field is a narrow drilling window. ... -
Evaluasi Hasil Hydraulic Fracturing Pada Sumur LANY-11 Lapangan "ALEZA"
(Universitas Pertamina, 2021-08-26)Aulia Nurul Izzah. 101317056. Evaluasi Hasil Hydraulic Fracturing Pada Sumur LANY-11 Lapangan “ALEZA”. Penelitian ini tentang pelaksanaan evaluasi hasil hydraulic fracturing dengan tujuannya adalah untuk memperoleh hasil ... -
Analisis Fenomena Liquid Loading Pada Deviated Gas Well Dan Penggunaan Gas Lift Sebagai Metode Delikuifikasi
(Universitas Pertamina, 2021-09-03)Penelitian tugas akhir tentang “Analisis Fenomena Liquid Loading pada Deviated Gas Well dan Penggunaan Gas Lift Sebagai Metode Delikuifikasi” dilakukan dengan tujuan untuk mengetahui, mengidentifikasi, memprediksi, serta ... -
ANALISIS LIQUID LOADING PADA SUMUR DEVIATED DAN CARA PENANGGULANGAN YANG TEPAT
(Lutfi Lailiyawati, 2021-08-03)Penelitian pada sumur FN80 merupakan sumur yang mengalami liquid loading ini memiliki tujuan untuk mengetahui cara identifikasi terjadinya liquid loading pada sumur deviated dengan simulasi software OLGA dan PIPESIM yang ... -
Analisis Perilaku Fluida Multifasa Pada Pipa Salur Lapangan UP-T
(Universitas Pertamina, 2021-09-03)Thea Victory Hasmegkris Halawa. 101317073. Analysis Multiphas Fluid Behavior In UP-T Field Flowline. The final project research on "Analysis of Multiphase Fluid Behavior in UP-T Field Flowline " uses synthetic databases ... -
Analisis Prediksi Liquid Loading di Sumur JB pada Water Cut dan Ukuran Tubing yang Berbeda
(Luciana Larasati D Dawa, 2021-09-02)Penelitian ini tentang analisis prediksi liquid loading di sumur JB pada water cut dan ukuran tubing yang berbeda. Tujuan penelitian ini untuk mengetahui kapan critical rate di sumur JB, menganalisis perilaku fluida ... -
PREDIKSI LIQUID LOADING MENGGUNAKAN METODE TURNER, COLEMAN, DAN NOSSEIR
(Universitas Pertamina, 2021-08-31)Fenomena liquid loading ditemukan pada 90% sumur gas. Liquid loading terjadi ketika gas yang diproduksikan tidak mampu mengangkat likuid dari dalam ke permukaan. Akibatnya, likuid akan terakumulasi dalam sumur sehingga ...
