Browsing DISSERTATIONS AND THESES (PE) by Title
Now showing items 343-362 of 587
-
History Matching and Uncertainty Analysis of Peripheral Water Injection in Mature Reservoir using tNavigator Software: Study of RZ-5 South Panel at Mahakam Delta
(Pertamina University, 2024-08-15)As an effort to achieve energy security in Indonesia, the government through SKK Migas targets total production in the oil and gas sector to reach one million barrels per day. One method to achieve this goal is the Enhanced ... -
History Matching Reservoir Gas Lapangan "X" KSO Indrillco Ltd.
(2020-08-10)Lapangan “X” merupakan lapangan gas onshore yang berada pada Cekungan Sumatera Selatan. Reservoir Lapangan “X” berada pada Formasi Baturaja dengan ketebalan kolom gas 90m. Lapangan “X” mulai diproduksikan pada 21 ... -
Hydraulic Design For Constant Bottom Hole Pressure Managed Pressure Drilling (MPD) Operation In Narrow Drilling Window Well
(Universitas Pertamina, 2021-08-19)Ivan Efendi. 101317063. Hydraulic Design For Constant Bottom Hole Pressure Managed Pressure Drilling (MPD) Operation In Narrow Drilling Window Well. The effect of a mature and depleted oil field is a narrow drilling window. ... -
Hydraulic Evaluation and Optimization of Directional Well in DLR-007 Well
(2023-07-20)DLR-007 Well is an onshore development well in the DLR field that has been drilled directional S Type. As a result of its high inclination, one of the common challenges encountered in this well is poor hole cleaning. Hence, ... -
HYDRAULIC OPTIMIZATION OF 8 ½” OH ONE PHASE WELL DRILLING IN LA-428 WELL
(Universitas Pertamina, 2022-06-24)One Phase Well (OPW) is one of the drilling innovations in the marginal field to increase the ratio of profit over well cost by eliminating 9 5/8” surface casing to reduce the well cost. The use of 9 ½” open hole in OPW ... -
HYDRAULIC OPTIMIZATION OF 8 ½” OH ONE PHASE WELL DRILLING IN LA-428 WELL
(Universitas Pertamina, 2022-06-24)One Phase Well (OPW) is one of the drilling innovations in marginal field to increase the ratio of profit over well cost by eliminate 9 5/8” surface casing to reduce the well cost. The use of 9 ½” open hole in OPW has the ... -
Identifikasi Nilai Saturasi Air Untuk Menentukan Bypassed Oil Menggunakan Metode Sameh & Walid di Lapangan Sada
(2024-08-13)Penelitian ini membahas tentang penentuan bypassed oil melalui perhitungan distribusi saturasi air menggunakan Metode Sameh & Walid di Lapangan Sada. Tujuan dari penelitian ini adalah untuk menentukan nilai saturasi air, ... -
INJEKSI METHANOL UNTUK MENGATASI MASALAH HYDRATE DI LAPANGAN SIWALIMA
(Universitas Pertamina, 2024-07-31)Penelitian ini berisi pemodelan injeksi methanol untuk mengatasi permasalahan hydrat di Lapangan Siwalima. Penelitian ini bertujuan untuk menentukan titik terbentuknya gas hidrat di Lapangan Siwalima berdasarkan kurva ... -
INTEGRATED PRODUCTION MODELLING (IPM) PADA LAPANGAN X
(Bhekti, 2022-09-08)Perancangan/penelitian ini tentang kegiatan pemodelan produksi terintegrasi (IPM) yang dilakukan pada lapangan X diarea laut utara, dengan tujuan untuk menghasilkan desain model terintegrasi yang mampu digunakan untuk ... -
INTERPRETASI LOGGING SUMUR DAN PREDIKSI LITOLOGI BATUAN MENGGUNAKAN SEMI-SUPERVISED MACHINE LEARNING
(Universitas Pertamina, 2021)Data properties petrofisik batuan merupakan data penting yang berguna dalam perhitungan cadangan hidrokarbon dan simulasi reservoir. Data ini juga dapat digunakan dalam proses pengidentifikasian litologi batuan yang akan ... -
INTERWELL CONNECTIVITY PREDICTION PROGRAM USING CAPACITANCE RESISTANCE MODEL (CRM) ON WATERFLOODED RESERVOIR
(2022-08-28)This thesis present implementation of Capacitance Resistance Model in a python code environment. The objective of the research is to estimate interwell connectivity (𝑓) parameter and visualize connectivity parameter through ... -
Investigating Affecting Variable for History Matching in Capacitance Resistance Model Using Matlab
(2021-06-14)Reservoir simulation is one of the important components in the petroleum industry. By conducting reservoir simulations in production, the production process will have less risk. Reservoir simulation will help company ... -
Investigating Affecting Variable for History Matching in Capacitance Resistance Model Using Matlab
(2021-06-14)Reservoir simulation is one of the important components in the petroleum industry. By conducting reservoir simulations in production, the production process will have less risk. Reservoir simulation will help company to ... -
KINERJA MODEL LAPANGAN TERINTEGRASI (IPM) DENGAN DISTRIBUSI GAS LIFT DI LAPANGAN JAPANGGA
(Jessica Janet, 2023-09-07)Penelitian ini dilakukan pada Lapangan Japangga yang terletak di offshore Java yang sudah berproduksi selama tujuh tahun dan memerlukan artificial lift untuk meningkatkan produksi. Kegiatan yang dilakukan berupa permodelan ... -
KRITERIA SELEKSI UNTUK PENENTUAN KANDIDAT SUMUR CAPILLARY STRING BERDASARKAN ANALISIS KEBERHASILAN DI LAPANGAN OLA KALIMANTAN TIMUR
(2020-08-17)Penelitian ini menganalisis bagaimana keberhasilan penggunaan metode capillary string di lapangan Ola dan menganalisis kriteria sumur yang berhasil menangani masalah liquid loading dengan capillary string. Beberapa sumur ... -
Laporan Tugas Akhir_101320097_Nur Aisya Arienda Putri
(2024-08-16) -
An LSTM-based Anomaly Classification on Subsea Oil-producing Well: Petrobras 3W Dataset
(Universitas Pertamina, 2024-08-14)The oil and gas industry faces significant operational risks from anomalous events, necessitating effective Abnormal Event Management (AEM) to prevent production losses, environmental damage, and safety hazards. Automation ... -
Machine Learning Algorithms Comparison for Stuck Pipe Detection in Geothermal Drilling Operation in North Sumatera, East Java and West Java Fields
(2024-05-31)Intensive geothermal drilling efforts are essential in order to reach the Indonesian government target of 3,355 Mwe by 2030. To reduce the overall risk of stuck pipe, a significant risk in drilling geothermal wells, ... -
MENENTUKAN PROPERTI GEOMEKANIKA DI INTEREST ZONE DAN SAFE MUD WINDOW DI WELL-COVID DENGAN PENDEKATAN 1D GEOMEKANIKA
(2021-09-07)ABSTRAK Arif Aulia Fikri. 101317052. Menentukan Properti Geomekanika di Interest Zone dan Safe Mud Window pada Well-Covid dengan pendekatan 1D Geomekanika. Penelitian ini membahas tentang menentukan Properti Geomekanika ...